<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: $80 million overhaul for W. 96th St. station heads to a hearing</title>
	<atom:link href="http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/feed/" rel="self" type="application/rss+xml" />
	<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/</link>
	<description>A New York City Subway Blog</description>
	<lastBuildDate>Sat, 20 Mar 2010 11:23:41 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
	<item>
		<title>By: Nestor Kermes</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-62435</link>
		<dc:creator>Nestor Kermes</dc:creator>
		<pubDate>Tue, 07 Jul 2009 14:56:50 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-62435</guid>
		<description>Now we can see the overly narrowing effect on the packed sidewalks for the sake of a dangerously misplaced cutesy entrance smack dab in the middle of heavily trafficked and accident-rich Broadway, just where idling vehicles spewing toxins franticly race engines to escape New York. A traffic mess has been made worse for what, another mini-train shed begat by profligate-spending MTA&#039;s edifice neurosis. Best to preserve the easily accessible sidewalk entrances, convert the sunk-barrel into another sleepy-hollow quaint museum like the oldster at the north. Sure provide an elevator for slow movers, where the comix musical ambience will be perfect for a belly-laughing overlook, healthily insulated by thick glass from the shrieking encaved miserables.</description>
		<content:encoded><![CDATA[<p>Now we can see the overly narrowing effect on the packed sidewalks for the sake of a dangerously misplaced cutesy entrance smack dab in the middle of heavily trafficked and accident-rich Broadway, just where idling vehicles spewing toxins franticly race engines to escape New York. A traffic mess has been made worse for what, another mini-train shed begat by profligate-spending MTA&#8217;s edifice neurosis. Best to preserve the easily accessible sidewalk entrances, convert the sunk-barrel into another sleepy-hollow quaint museum like the oldster at the north. Sure provide an elevator for slow movers, where the comix musical ambience will be perfect for a belly-laughing overlook, healthily insulated by thick glass from the shrieking encaved miserables.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Progress aboveground at 96th St. :: Second Ave. Sagas &#124; A New York City Subway Blog</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-60336</link>
		<dc:creator>Progress aboveground at 96th St. :: Second Ave. Sagas &#124; A New York City Subway Blog</dc:creator>
		<pubDate>Thu, 23 Apr 2009 17:30:22 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-60336</guid>
		<description>[...] 96th St. station on the West Side IRT is currently a mess. As part of an $80 million overhaul of this heavily-trafficked station, the MTA is constructing a brand new station house in the middle [...]</description>
		<content:encoded><![CDATA[<p>[...] 96th St. station on the West Side IRT is currently a mess. As part of an $80 million overhaul of this heavily-trafficked station, the MTA is constructing a brand new station house in the middle [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: A new look for 96th St. :: Second Ave. Sagas &#124; A New York City Subway Blog</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-58951</link>
		<dc:creator>A new look for 96th St. :: Second Ave. Sagas &#124; A New York City Subway Blog</dc:creator>
		<pubDate>Wed, 25 Feb 2009 22:19:58 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-58951</guid>
		<description>[...] part of a plan to substantiall rehabilitate and renovate the IRT stop at 96th St. and Broadway, construction crews have unveiled a new look for the wall [...]</description>
		<content:encoded><![CDATA[<p>[...] part of a plan to substantiall rehabilitate and renovate the IRT stop at 96th St. and Broadway, construction crews have unveiled a new look for the wall [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Streetsblog &#187; 96th Street Subway Station and Sidewalk Reduction Moving Ahead</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-653</link>
		<dc:creator>Streetsblog &#187; 96th Street Subway Station and Sidewalk Reduction Moving Ahead</dc:creator>
		<pubDate>Fri, 08 Jun 2007 16:39:51 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-653</guid>
		<description>[...] on either side of Broadway while maintaing all of the existing street space for motor vehicles. Second Avenue Sagas [...]</description>
		<content:encoded><![CDATA[<p>[...] on either side of Broadway while maintaing all of the existing street space for motor vehicles. Second Avenue Sagas [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Becca</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-647</link>
		<dc:creator>Becca</dc:creator>
		<pubDate>Wed, 06 Jun 2007 03:34:22 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-647</guid>
		<description>But I need my 26 seconds! Actually, I&#039;ll be quite pleased to not have the &quot;turning the corner from Gristedes&quot; smash into exiting subway passengers.

Now if only someone would take over Nobody Beats the Wiz, the area would be set.</description>
		<content:encoded><![CDATA[<p>But I need my 26 seconds! Actually, I&#8217;ll be quite pleased to not have the &#8220;turning the corner from Gristedes&#8221; smash into exiting subway passengers.</p>
<p>Now if only someone would take over Nobody Beats the Wiz, the area would be set.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Victoria</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-646</link>
		<dc:creator>Victoria</dc:creator>
		<pubDate>Wed, 06 Jun 2007 01:47:50 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-646</guid>
		<description>Hahahah they wrote the same thing!</description>
		<content:encoded><![CDATA[<p>Hahahah they wrote the same thing!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Benjamin Kabak</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-652</link>
		<dc:creator>Benjamin Kabak</dc:creator>
		<pubDate>Tue, 05 Jun 2007 21:11:37 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-652</guid>
		<description>&lt;em&gt;One more thing, the hearing is actually being held tomorrow (Wed, June 6).&lt;/em&gt;

Gah. Corrected.

This was one of those weeks where I kept thinking it was the day after it really was. Fixed. Sorry about that.</description>
		<content:encoded><![CDATA[<p><em>One more thing, the hearing is actually being held tomorrow (Wed, June 6).</em></p>
<p>Gah. Corrected.</p>
<p>This was one of those weeks where I kept thinking it was the day after it really was. Fixed. Sorry about that.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Brian</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-651</link>
		<dc:creator>Brian</dc:creator>
		<pubDate>Tue, 05 Jun 2007 21:09:42 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-651</guid>
		<description>One more thing, the hearing is actually being held tomorrow (Wed, June 6).

http://mta.info/mta/news/hearings/index.html</description>
		<content:encoded><![CDATA[<p>One more thing, the hearing is actually being held tomorrow (Wed, June 6).</p>
<p><a href="http://mta.info/mta/news/hearings/index.html" rel="nofollow">http://mta.info/mta/news/hearings/index.html</a></p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Benjamin Kabak</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-650</link>
		<dc:creator>Benjamin Kabak</dc:creator>
		<pubDate>Tue, 05 Jun 2007 21:02:37 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-650</guid>
		<description>Thanks for the correction, Brian. Since departing the Upper West Side for the hills of Park Slope, I missed that request from O&#039;Donnell.</description>
		<content:encoded><![CDATA[<p>Thanks for the correction, Brian. Since departing the Upper West Side for the hills of Park Slope, I missed that request from O&#8217;Donnell.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Brian</title>
		<link>http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-649</link>
		<dc:creator>Brian</dc:creator>
		<pubDate>Tue, 05 Jun 2007 21:01:08 +0000</pubDate>
		<guid isPermaLink="false">http://secondavenuesagas.com/2007/06/05/80-million-overhaul-for-w-96th-st-station-heads-to-a-hearing/#comment-649</guid>
		<description>The plan shouldn&#039;t include a narrowing of the sidewalk on both sides of broadway. With people having to wait &#039;an average of 26 seconds&#039; to cross Broadway, more room will be needed on the sidewalks for those people to wait. Otherwise a great plan.

And a correction: Since last year, the SE corner exit has been open 24/7 because of a request from Assembly Member Daniel O’Donnell.</description>
		<content:encoded><![CDATA[<p>The plan shouldn&#8217;t include a narrowing of the sidewalk on both sides of broadway. With people having to wait &#8216;an average of 26 seconds&#8217; to cross Broadway, more room will be needed on the sidewalks for those people to wait. Otherwise a great plan.</p>
<p>And a correction: Since last year, the SE corner exit has been open 24/7 because of a request from Assembly Member Daniel O’Donnell.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
