Home Asides Quick Hits: More frequent board meetings; repairs in Northern Manhattan

Quick Hits: More frequent board meetings; repairs in Northern Manhattan

by Benjamin Kabak

Two minor transit stories surfaced today that warrant a quick mention. Toward the end of his tenure as MTA CEO and Chairman, Joe Lhota announced a plan to reduce the number of MTA Board meetings per year. Lhota proposed eight meetings and two public forums instead of 11 monthly meetings. This move lasted all of seven months as the MTA this week will vote on a plan to revert to its long-standing tradition of monthly meetings.

The Times first reported this story earlier today, and the details are buried in the Governance Committee materials [pdf]. Essentially, the change hasn’t fit in with operating procedures at the MTA. Data is gathered monthly even if it is reported to the Board only every six or seven weeks, and a long gap between meetings can slow down emergency appropriates and approvals needed to respond quickly to damage caused from, say, a major hurricane. Whether this is a case of a lumbering bureaucracy failing to adapt to a new normal or a clear sign that monthly meetings are required is up for debate.

In other news, renovations at two Northern Manhattan subway stops have begun, DNA Info reported. On its own, this isn’t exactly a pressing concern, but these aren’t normal stops. Back in 2009, a section of the ceiling at 181st St. fell on the tracks, and a subsequent inspection revealed structural concerns with the tiling at that station and 168th St. It’s stunningly taken nearly four years to get long-term repairs started.

The work will cost $42 million, and the MTA anticipates a completion time of 29 months. During the next two a half years, the 1 train will not run north of 137th St. for 13 weekends and 40 overnights. This is a prime example of a location where a total line shutdown would result in faster work, but many commuters north of Dyckman St. have no nearby alternate subway service.

You may also like

1 comment

D in Bushwick July 22, 2013 - 5:21 pm

I’ve used both of these stations several times the last couple years and the reason the repairs aren’t done after four years is because NOTHING happens at these stations. Just annoying scaffolding and no union guys to be found.
This transit system desperately needs an enema.

Reply

Leave a Comment