Second Ave. Sagas
  • About
  • Contact Me
  • 2nd Ave. Subway History
  • Search
  • About
  • Contact Me
  • 2nd Ave. Subway History
  • Search
Second Ave. Sagas

News and Views on New York City Transportation

MTA Politics

Boosting congestion pricing, Cuomo and de Blasio unveil 10-point plan for MTA reform

by Benjamin Kabak February 27, 2019
written by Benjamin Kabak on February 27, 2019

In a rare moment of political unity from the mayor and governor, Bill de Blasio and Andrew Cuomo unveiled on Tuesday a ten-point plan to fund and reform the MTA. Notably, the plan showcases congestion pricing as the prime funding mechanism, and the announcement marks the first time the mayor has issued a public endorsement of congestion pricing. It also introduces an internet sales tax and the so-called “Weed for Rails” proposal NYU and Melissa Mark-Viverito introduced in December which directs cannabis excise tax dollars to transit funding.

All told, it’s an aggressive show of unity from the mayor and governor that could allow the MTA to bond out up to $22 billion a year for capital funding and should usher in an era of congestion pricing, in some form or another, to free up New York City’s overcrowded streets. But is it a good plan? Is it the right one for New York City? Does it deliver enough for beleaguered transit riders without giving away too much to a governor hellbent on exerting as much control as he can over an agency that, at its core, runs the transportation engine that powers New York City? Let’s dive in.

I’ve written this post as a series of segments so you can jump around if you’d like. I’ll tackle the proposal first; the political reaction second; feedback from other transit advocates third; and some concluding thoughts last.

A. Analysis of the Proposal
B. The Political Reaction
C. Transit Advocates Respond
D. My Take On The Whole Thing

The Proposal

The Governor and the Mayor’s ten-point plan arrived on Tuesday morning in the form of a massive press release. The Mayor put out a subsequent release with his own statement and spoke to reporters later in the day. Cuomo’s public statements came in the form of a friendly interview with Brian Lehrer. I’ll cover both of those in the next section. Let’s take a look at what the two politicians, not exactly friends or fans of transit, are proposing.

1. Reorganize the MTA

As the lead part of the proposal, the MTA is going to reorganize itself to create a more centralized governing body. As the two announced, “All common functions such as construction management, legal, engineering, procurement, human resources, advertising etc. will be consolidated and streamlined in a central operation. The individual divisions will focus on day-to-day management of their primary operation.” The MTA is expected to complete this plan by June and bring with it a change in culture “which will generate fresh ideas and new perspective from new and recently appointed senior and mid-level management recruited from the private sector and other cities and states.”

As an aside, for what it’s worth, the private sector does not have a magic wand that will fix the MTA, and based on current MTA hiring freezes and pay scales, most people moving into middle management roles from the private sector are unlikely to be top talent. That said, it’s not impossible to recruit top talent, but this is not likely to be a real fix. I touch on this more below in my analysis.

2. Congestion Pricing

Along with the MTA reorg, congestion pricing will become a reality with a go-live date of December 2020, following approval of the MTA’s next five-year capital plan. The congestion pricing zone will encompass Manhattan south of 61th St. and will be enforced via electronic cashless tolling, under the auspices of the Triborough Bridge and Tunnel Authority.

Revenue from congestion pricing — and the internet sales and cannabis excises taxes — would be placed into a transit lockbox, but there are certain exemptions, implemented at the direction of the notorious motorist Bill de Blasio: “Tolls would be variable providing discounts for off-peak hour travel. Emergency vehicles will be exempt from congestion pricing tolls. Other exemptions or discounts will be provided to a limited group of vehicles entering the CBD including vehicles operated by or transporting people with disabilities and individuals who have an identifiable hardship or limited ability to access medical facilities in the CBD.”

3. Fare Hike Caps

All fare hikes will be limited to “inflationary increases” of 2% per year (which they already are and have been for a while).

4. MTA Board Appointments

All MTA Board appointments will be coterminous with the terms of the official who made the appointment or recommendation. Thus, all mayoral appointees would expire upon the end of a mayoral administration and ditto for a governor, county executive, etc.

5. Fare Evasion

I’ll quote this one because I am truly exhausted and tired of this red herring of a conversation:

Partnership between the State and City is necessary to combat fare evasion. We cannot have a voluntary fare system and still maintain a system that ensures operational stability. The State will work with the MTA, City and District Attorneys to develop an enforcement strategy, with both personnel and station design modifications that do not criminalize fare evasion but instead prevent fare evasion, sanction violators and increase enforcement.

6. Audit

According to the press release, someone will audit the MTA to “determine their actual assets and liabilities” and provide budgetary statements that do not “strain financial credibility,” as Cuomo has consistently claimed, not incorrectly, that they do.

7. Regional Transit Committee

Seemingly replacing the opaque Capital Program Review Board, which effectively offers a veto point to the governor, mayor, Senate and Assembly over the MTA Capital Plan, a Regional Transit Committee, consisting of members “who have no existing financial relationship with the MTA” will review the Capital Plan and any toll and fare increases proposed “as necessary to fund the Capital Plan.” It’s not clear if this board will review toll and fare increases that fund only operations or why an additional layer of bureaucracy is needed here.

8. The Columbia and Cornell Experts Return

Not content to rest on his L train laurels, Cuomo is bringing back his pals from Cornell and Columbia to conduct construction review on every major project. The press release muddles terminology and glosses over the fact that Andy Byford recently brought in one of the foremost expert in signal technology to do exactly this, but take a read:

The MTA will have all major construction projects and planned projects pursued as “design build.” The MTA will do preliminary drawings only to the point necessary for bidding the project in a private sector competition based primarily on cost and timing of the project. Selections will be made with incentives and sanctions for performance. All major construction projects will be reviewed by construction and engineering experts who are not affiliated with the MTA or its consultants. The construction review team will be headed by the Deans of Cornell School of Engineering and Columbia School of Engineering to assure state of the art design and technology is being deployed. This group will also review the plans for signal system upgrade methodology and decide the best system to use, specifically comparing Communications Based Train Control (CBTC) to Ultra-Wide-Band (UWB) technology for safety, timeliness and cost. The MTA will be more aggressive in debarring failed contractors.

It’s not clear if these Cornell and Columbia deans have the expertise to review every MTA construction project or why they’re willing to engage in this charade. Notably, this item does not include actual cost control, a true reform that’s badly needed.

9. Expedite the Subway Action Plan

OK. This is really stretching a “ten items” list now.

10. Stop. Collaborate. Listen.

I quote: “The Governor and Mayor will work closely with the Legislature to effectuate provisions in this framework.” This shouldn’t count as an item, but it does. The bulk of this list arises out of items 1, 2, 7 and 8, and the rest are window-dressing. This is an four-item plan with some filler and a vague promise to enact (or maybe reenact?) current practices.

The Political Reaction

Following the release of this list, Cuomo and de Blasio spent some time defending the proposal, as they should. The mayor, who has long resisted the progressive pull of congestion pricing, threw some shade on the idea, as he does. He released the following statement:

“Working New Yorkers struggle every day to get around our city. We cannot let another year pass without action that makes people’s lives easier. This crisis runs deeper than ever before, and it’s now clear there is no way to address it without congestion pricing and other dedicated revenue streams. The time to act is now.

“The proposal we’re announcing today addresses concerns I’ve raised related to a lockbox for transit, fairness to the outer boroughs and accommodating hardships. I still believe a Millionaires Tax provides the best, most sustainable revenue source for the transit improvements our city needs. But the time to act is running out, and among all alternatives, congestion pricing has the greatest prospects for immediate success. In light of this reality, it is my hope that critics of congestion pricing will join me in acknowledging its necessity.

“I look forward to partnering with the Governor and the Legislature as we work to ensure this proposal to revitalize the MTA becomes a reality.”

I don’t believe the Mayor will ever get to the point of embracing congestion pricing. He is a self-proclaimed motorist who has spent years driving short distances easily covered by transit simply because he can and he likes it better. He doesn’t understand the environmental imperative for congestion pricing or the reality that the congestion-choking status quo is simply economically harmful and unsustainable for a vibrant urban area. He doesn’t care to learn how congestion pricing, if implemented properly, will clear the roads while boosting productivity and mobility. But if he’s willing to fight for this proposal, maybe that’s OK. Proponents need all the friends they can get, and that includes the mayor right now.

The governor, on the other hand, appeared on the Brian Lehrer Show shortly after releasing the press release and engaged in an enlightened discussion with the WNYC host. Cuomo talked about the exceedingly low percentage of New Yorkers driving into Manhattan and the need to clear streets to improve transit. “It doesn’t matter how well the bus is running if the bus is only going four miles an hour because there’s so much congestion,” Cuomo said of the congestion reduction benefits.

Overall, though, Cuomo said nothing new. He talked at length about the various arcane politics behind MTA governance and funding. He repeated his lies and half-truths about MTA control and spoke, as he often does, as one who does not control the MTA even though he very clearly does. He’s willing to go to bat for his plan, perhaps more than the mayor is, but that doesn’t get to the fundamental question as to whether this plan is good.

Some politicians weren’t convinced. Assembly Speaker Carl Heastie expressed reservations about earmarking taxes from the legalization of recreational marijuana to transit. He feels these funds should go first to those who suffered due to the war on drugs.

City Council Speaker Corey Johnson also expressed skepticism. He’s currently working on a proposal for city control of the buses and subways, an argument likely to be the centerpiece should Johnson run for mayor in 2021.

My statement re: Governor Cuomo and Mayor de Blasio’s joint congestion pricing announcement.

And I will have more to say on this soon — stay tuned. pic.twitter.com/Nq2OBy9BN5

— NYC Council Speaker Corey Johnson (@NYCSpeakerCoJo) February 26, 2019

The Advocates Chime In

And what of the transit and good governance advocates? Unsurprisingly, reaction was mixed. Both the Tri-State Transportation Campaign and Riders Alliance celebrated the pro-congestion pricing statement. Nik Sifuertes, head of TSTC called it a “smart, sensible framework for congestion pricing that builds on the successes of other cities and is tailored to New York City’s unique needs.”

John Raskin of the Riders Alliance noted the two leaders’ kumbaya moment. “When the governor and mayor put out a plan together, it means real momentum toward enacting congestion pricing to fix the subway,” he said. “The agreement reflects a growing recognition that congestion pricing alone won’t solve the transit crisis, but that it is the single largest source of revenue on the table and should be the cornerstone of a bigger funding package.”

Others were a bit more skeptical. Transit Center raised a concern about the requirement that any reorganization of the MTA be completed by June.

TransitCenter statement regarding today's announcement by Governor Cuomo and Mayor de Blasio on congestion pricing and the MTA: pic.twitter.com/nhQ0rxAkR5

— TransitCenter (@TransitCenter) February 26, 2019

But the most withering take came from Reinvent Albany, a good governance watchdog group pushing from reform and transparency in Albany. This group, headed by John Kaehny, raised “serious concerns” with the plan and wondered if the plan will do more harm than good. Reinvent Albany strongly supports congestion pricing and new revenue for the MTA, but we believe the MTA’s biggest organizational problem is the Governor’s endless political meddling and sidelining of the MTA and NYC Transit professional staff.”

Specifically, Reinvent Albany noted that Cuomo has yet to provide $7.3 billion of the promised $8.3 billion for the 2015-2019 Capital Plan and raised specific issues with the key items. I’ll quote a fe of them as these are astute and valuable observations.

  • Andy Byford, NYCT President stripped of power. The Governor’s proposed reorganization takes away a huge amount of fundamental management authority from New York City Transit President Andy Byford and shifts it to MTA Headquarters (HQ). What happens with Byford’s Fast Forward Plan if he can’t implement it? The governor proposes shifting engineering, contracting and construction management to MTA HQ. We note that MTA HQ has completely mismanaged the East Side Access project with up to $7B in cost overruns. (Item #1)
  • Congestion pricing proposal creates a gigantic new loophole by creating vast, vague exceptions for motorists. Given the disastrous experience with state and NYC issued parking placards, this is an invitation for abuse and petty corruption. (Item #2)
  • …

  • The Regional Transit Committee duplicates and subtracts from the MTA Board’s authority and will create even more confusion. If the legislature wants representation on the MTA board or changes to the board, it should make them instead of creating a confusing mess that further reduces accountability. The MTA board should determine fares, tolls, and budgets, etc. If it does it poorly, reform it. (Item #7)
  • The MTA, like other state authorities and agencies, should be run by professionals, not overseen by unqualified, arbitrarily selected academics hand-picked by the governor. There are many people in the world with more far more expertise on transit engineering and technology than the Deans of Columbia and Cornell engineering schools — including within the MTA. Why should these informal advisors to the governor determine what kind of signals technology the MTA uses? (Item #8)

The group further believes this effort by Cuomo is essentially a rush job with de Blasio’s blessing for the governor to shore up power and take over a city concern. “This is not the time to make major changes to redistribute power over the MTA’s governance structure, as there are too many stakeholders at risk,” the statement concludes. “Changes to the governance of the MTA should be made independently of the budget after full and thorough discussion by MTA stakeholders and the public.”

My Take

So after over 2000 words, you must be wondering where I come out. It’s no secret that I’m inherently skeptical of Andrew Cuomo’s views on transit. He hasn’t shown a willingness to understand transit’s primary role in the NYC economy, and he approaches projects with a very top-down attitude. What he wants to do is what goes, and he doesn’t speak to the experts. That’s how we end up with a fancy Moynihan Station headhouse a long block away from the subways and with no trans-Hudson capacity increases, the Backwards AirTrain and two airport rehabilitation projects that don’t expand runway space.

In this case, Cuomo seems to be punting on his own responsibilities as the executive in charge of the MTA while drawing the city into his funding fight and exerting control over New York City streets. He’s introducing a new layer of bureaucracy to MTA decision-making without tackling the fundamental cost, labor and management reforms the MTA desperately needs to succeed. He’s overseen a hiring freeze at the MTA while bringing in the academics without the right expertise to second-guess everything, and by appealing to the private sector — a sector not inherently better at the tasks with which the MTA struggles — he’ll attract bottom, rather than top, talent.

To make matters worse, Cuomo seems to be creating an MTA that embodies the worst of current practices. Centralized decision-making and procurement has led to a mess at MTA Capital Construction, an agency that constantly builds the world’s most expensive subways, tunnels, headhouses, and terminals. This isn’t the model to emulate, but it seems to be the one Cuomo is pushing. It also may sideline Andy Byford and remove his Fast Forward plan from the purview of New York City Transit, but various government sources denied that possibility throughout the day.

Don’t get me wrong: As I mentioned above, I’m quite pleased to see the mayor, begrudgingly at best, accept congestion pricing as the way forward, and I’m glad to see the governor will put his weight behind enacting a plan to start to limit traffic in Manhattan. That plan, of course, has to come with promised transit upgrades first and street redesigns to encourage higher volume and better quality usage.

Yet, for all of its words and promises, the plan seems to shuffle the deck chairs to give Cuomo control and more deniability. David Meyer, over at Streetsblog, picked up this theme in a post I’d urged you to read. I’ll quote:

The whole package represents a major power grab for Cuomo, whose eight-plus years as steward of the country’s largest transit system led to the greatest crisis it’s ever faced. Starved for money and facing criticism from all sides, the MTA has instituted a hiring freeze and is contemplating layoffs when it should be beefing up its operation to turn the system around. “Cuomo has blotted out all other political actors here,” said one longtime MTA observer. “These geniuses that he wants to bring in from Columbia, what do they think about hiring freezes and across-the-board cuts as a method for reinvigorating an organization?”

The observer noted that two previous attempts at inter-MTA consolidation have been abject failures. The first, MTA Capital Construction, created in the mid-2000s to improve the agency’s execution of mega-projects, is best known for its over-budget and delayed work on East Side Access and the Second Avenue Subway. The second, the Business Service Center, is notoriously loathed within the agency for its incompetence and unresponsiveness. “If you like the BSC, you’ll love this. And I don’t know anybody who loves the BSC,” the observer said. “This is an arson to cover up a robbery.”

Every time Cuomo and de Blasio wade into the transit space, I hold my breath and hope for the best. These are not leaders who are strong on transit, and the city is, for better or worse at a turning point. Andy Byford’s plans to speed up the subways are starting to work, despite political winds blowing against him, but the turnaround could be modest if the governor and the mayor pull the rug out from underneath everyone. The two seem to want international experts to stick around to oversee a planned subway renaissance, and congestion pricing ought to help the beleaguered bus system in particular. But is this a good plan, endorsed by those who are experts in transit governance and management? It this the right plan for right now? I’m not yet convinced it is, but as always, the devil will be in the details which will come fast and furious as the June reorganization deadline looms.

February 27, 2019 12 comments
2 FacebookTwitterPinterestEmail
L Train Shutdown

Reduced L train mitigation plan, without a busway, comes into view as station metering concerns linger

by Benjamin Kabak February 19, 2019
written by Benjamin Kabak on February 19, 2019

The comprehensive L train mitigation plans shown here were shelved when Gov. Cuomo canceled the shutdown. (Click to enlarge)

Since the MTA officially canceled the L train shutdown and Gov. Andrew Cuomo wrapped up his MTA powerplay last month, all has been quiet on the Canarsie front. Various advocacy groups have been jockeying for the city to commit to maintaining robust people-first travel options and a true dedicated busway along 14th St., but with politicians wavering and silence from the Mayor’s Office, we’ve seen more rallies but little concrete action.

The silence buckled a bit last week when MTA officials briefed reporters and local politicians on their mitigation plans for the L train’s upcoming not-quite-a-shutdown shutdown. Though the 14th St. busway remains a decision under NYC DOT’s purview, the MTA will still roll out Select Bus Service along the busy and painfully slow M14 corridor, but the rest of the mitigation plan involves beefing up nearby subway service and hoping for the best. The agency clearly believes that most L train riders who do not opt for taxis of various shades and apps will complete their trips via subway, and if the proposed mitigation isn’t sufficient, well, the L train shutdown plans are only just mothballed.

If not a full-blown, car-restrictive mitigation plan, what then is the MTA going to implement? So glad you asked.

We’ll start with the L train service plan. On weeknights from 10 p.m. until 5 a.m. and throughout the weekend during the work, L trains will run between Brooklyn and Manhattan every 20 minutes. This does not, however, mean full L train service the rest of the day as the MTA has to “ramp down” L trains beginning at 8 p.m. on weeknights. The ramp down, as I understand it, is to allow work trains to move into position to maximize the seven-hour construction window. But even occasion service delays at that hour will be impactful. As regular L train riders know, the L train is far from empty at 10 p.m., let alone 8 p.m., and this service slowdown will inevitably disrupt nightlife along the L train, a big part of the NYC economy whether hipster-hating New Yorkers want to admit it or not.

On the Brooklyn side of the tunnel, L trains will run from Lorimer St. to Canarsie every 10 minutes until 1:30 a.m. until reverting to the current 20-minute overnight headways. Essentially, the MTA will run every other Lorimer-bound L train past Lorimer St. into Manhattan, and the other half will turn around at Lorimer and head east again.

To provide pick up the load, the agency plans to run five additional G trains on weeknights between 8:30 p.m. and 1:30 a.m. in both directions. G trains though will not be lengthened as initially promised under the original mitigation plan. Rather, Transit officials believe shorter trains with more frequent headways can better move more people. On weekends, the G will run every eight minutes from 10 a.m. to 8 p.m. on Saturdays and noon to 8 p.m. on Sundays instead of every ten.

Similarly, M trains will run into Manhattan, terminating at 96th St. and 2nd Ave. (instead of Queens Boulevard) from 10 p.m. until 1:30 a.m., and M trains will operate with eight-minute headways running to the Upper East Side on weekends as well. Transit officials insist that this M train rerouting will not reduce service on the Queens Boulevard line, but it’s not quite clear to me how that’s the case.

Some other perks include five additional 7 trains between 8:30 p.m. and midnight and more frequent 7 train service on the weekends. The MTA will also institute free out-of-system transfers between the 3 and L at Junius/Livonia and between the G and J/M in the Broadway/Hewes/Lorimer area. Additionally, the MTA will institute bus loops on the Brooklyn side, providing weeknight service every three minutes from Bedford to Metropolitan to Broadway and from Hewes to Marcy to Metropolitan. Weekend frequency for these bus loops remain under review.

On the Manhattan side, things get a bit dicier as the MTA plans to run M14 buses every three minutes up and down 14th St. Without a commitment by the city to the busway though, it’s very easy to see how this plan falls apart instantly as significant bus traffic fights for limited street space with the private automobiles that already choke 14th St. in congestion. Without enforced, dedicated lanes, this bus plan will fail, and anyone who is able to will find walking across Manhattan faster.

Finally, the wild card in all of this planning is station metering — or the practice of limiting access to station platforms during periods of extreme crowding. Metering first became part of the public discussion when early drafts of this mitigation plan leaked to Streetsblog and Gothamist in late January. Although the MTA denied that these plans were ripe for public review, what the agency presented last week essentially mirrors those earlier leaks, and crowd control was a big concern.

Could the MTA, then, implement exit-only restrictions at certain Manhattan L train stations or station metering in which platforms are closed and passengers have to queue up in station mezzanines or at street level? In a statement on crowd control and station metering, Maxwell Young, the MTA’s new chief external affairs officer, downplayed this outcome. “We’re still evaluating the best options to deal with crowding, which we anticipate to be especially high only on only a couple of hours during the weekends,” he said. “We will be working with our partners at the NYPD and the DOT to put in place a plan to make sure everyone stays safe. Making stations exit only is not our preferred solution.”

There’s an element of “hold your breath and hope for the best” in this plan, and the pain points are quite clear. The uncertain fate of the 14th St. looms large, and the cancellation of HOV3+ restrictions on the Williamsburg Bridge could lead to an Uber-pocalypse during weekends as Brooklyn-bound riders get fed up with roundabout alternate routes, long waits and extremely crowded trains. But as I said, the city and MTA both have the plans for more expansive mitigation plans at the ready should traffic and transit service grind to a halt when the L train work begins in earnest.

The key here is what we’ve lost. Where once we had certainty, the MTA doesn’t yet know how long this new approach to the Canarsie Tunnel work will take or how many weekends the city will be stuck with 20-minute L train headways. Furthermore, we’re losing an opportunity to watch a new approach to work unfold before our eyes. The L train was to be a model for Andy Byford’s Fast Forward plan, a way to shut down train lines, provide alternate service options and blitz the line with modernization work. But when push came to shove (or when a mystery many grabbed him by the lapels), Cuomo turned away from this new model. Maintaining service should be the goal of any transit operator, but in this case, maintaining — and, more importantly, improving — service might have required a temporary outage. Instead, we get a Band-Aid and a leaky one, at that.

Editor’s Note: Second Ave. Sagas is starting its second year of being fully reader-supported. To ensure ads do not interfere with the site and to expand my content offerings, I started a Patreon for Second Ave. Sagas. If you like what you read and want more of it (including the return of my podcast), please consider a monthly donation. I’ll be back later this week with an analysis of a key Scott Stringer report on subway delay reporting. Thank you, as always, for your support.

February 19, 2019 26 comments
3 FacebookTwitterPinterestEmail
Brooklyn-Queens Connector

BQX inches forward as NYC tabs VHB to lead environmental review

by Benjamin Kabak February 12, 2019
written by Benjamin Kabak on February 12, 2019

The slow churn of the BQX continued last week when the city awarded a contract to VHB to prepare an environmental impact statement. (Source: NYCEDC)

When last we saw the Brooklyn-Queens Connector, Mayor Bill de Blasio’s half-embraced, half-developed plan for a waterfront streetcar, the project seemed to be inching toward a quiet demise. The city had just admitted that the original self-funding plan would not generate enough money to cover construction costs, and operations would not begin until 2029, eight years after the project’s current champion is term-limited out of Gracie Mansion. But the zombie BQX isn’t dead yet as the NYC EDC announced last week a $7.25 million contract with VHB for the land-use and transportation planning group to produce the project’s environmental impact statement, due in September of 2020.

The EIS is the first in a very staggered planning schedule, and it will precede the ULURP review process with which VHB will also assist. The EIS is designed to, in the words of Railway Age, “preserve the city’s ability to use federal funds for the construction of BQX and ensure that work meets permitting standards set by the United States Army Corps of Engineers or U.S. Coast Guard related to construction in navigable waters.”

As part of the contract, the city also announced another round of significant community outreach to wary residents and politicians along the route, and the project’s proponents used the award of this contract to celebrate a step forward. “These steps show meaningful progress for the project — something we’ve been eager to see,” Jessica Schumer, Executive Director of the Friends of the Brooklyn Queens Connector, said in a statement. “We are pleased with the city’s commitment not just to moving the project forward, but to community engagement, which much play a central role. As the city grapples with a transit crisis, now is the moment for it to take control of its mass transit destiny and expand access wherever it can. The BQX is an essential first step and will provide a model for future city-run light rail lines in transit deserts across the city.”

Still, even with this contract award, the future for this project remains murky at best. Critics have questioned the city’s rosy ridership projections of 50,000 per day, and even that would put the BQX on par with moderately busy bus lines at a significantly higher cost. “We don’t expect the ridership to justify the cost,” Ben Fried, the spokesperson for Transit Center, said to The Wall Street Journal.

Meanwhile, many of the people the de Blasio administration have tapped for the project have moved on. Adam Giambrone, who served as the director of the BQX for over two years, departed his post in the fall to take a high-profile job in Saudi Arabia, and Jonathan Gouveia, a one-time NYC EDC VP who focused nearly exclusively on the BQX, joined NYCHA late last month as a senior vice president of real estate. It’s not actually clear who’s spear-heading the effort within the de Blasio administration, and it’s hard to say if the mayor will stay focused enough to push through a project that’s still at least a decade away from revenue service.

Ultimately, I see a city-run light rail as a potential opportunity for a new model of transit development in New York City that removes the MTA (and Albany) from the equation, but the process has to be aggressively managed and pushed forward in a timely basis. The route should be a high-capacity demand corridor that can be implemented quickly and can’t otherwise be replicated with better bus service via aggressive lane, curb and signal management. In that regard, a waterfront route probably doesn’t count it, and investment in the BQX should not take precedence over a renewed focus from the city on better bus service.

But the BQX isn’t dead yet. This EIS award is only a week later than anticipated, and for now, the project remains on schedule for construction to begin in 2024. That, however, I’ll believe when I see it.

Editor’s Note: Second Ave. Sagas is starting its second year of being fully reader-supported. To ensure ads do not interfere with the site and to expand my content offerings, I started a Patreon for Second Ave. Sagas. If you like what you read and want more of it (including the return of my podcast), please consider a monthly donation. I’ll be back later this week with an analysis of a key Scott Stringer report on subway delay reporting. Thank you, as always, for your support.

February 12, 2019 24 comments
2 FacebookTwitterPinterestEmail
View from Underground

To combat fare evasion, MTA re-alarms some emergency exits

by Benjamin Kabak February 6, 2019
written by Benjamin Kabak on February 6, 2019

Here’s the MTA solution, via NYPD edict, on how to fix the “crisis” of fare evasion: constant siren wailing from exiting with no one there to do anything about it.

This is one random minute at 14th.

cc: @MTA @Gothamist @NY1 @JMartinezNYC @errollouis @NYCMayorsOffice @NYPDnews pic.twitter.com/IlZMLP0U7s

— Jeremy Wilcox (@jwilcox79) January 16, 2019

New York City, they say, is a cyclical town. Neighborhoods wax and wane; popular restaurants open and close; the city rises and falls; and even the Mets may be good again one day. Not everything that comes back is welcome, and four years after finally silencing emergency alarms, the MTA has turned some back on, at the request of the NYPD, in an effort to fight fare evasion. That ear-splitting sound, the subject of much consternation a decade ago, is back.

I first wrote about the debate over emergency exits back in 2009 when the conversation focused around the the ethics of opening doors knowing an ear-splitting siren would follow. In 2010, the New City Transit Riders Council issued a damning report on the ineffectiveness of the alarms. With the alarms still armed, Riders Council observers witnessed thousands of riders streaming out of the doors (and a handful entering without paying through the doors). In 2014, The New York Times created an op-doc on the doors, and when 2015 dawned, the MTA silenced the alarms, seemingly for good.

“Our customers,” then-agency spokesman Kevin Ortiz said, “have been quite clear in displaying their annoyance and letting us know that the alarms really were the number one annoyance for them as they travel through the system.”

Well, sounds that were annoying have been forgotten, and as the MTA and NYPD look to combat what they claim is a real increase in fare evasion, alarms at certain key stations have been turned back on. I first got wind of the unwelcome return of these alarms in mid-January when Twitter reports came in of alarms at Union Square, Columbus Circle, Jay St.-Metrotech and Times Square, among other stations. The alarms are not, as I can attest, back on at every station, and it seems that only a few fare evasion hotspots have been tagged for activation.

After some tense back-and-forth on Twitter over the need for the alarms, the MTA provided me a statement on the emergency exits. The NYPD, it seems, asked the agency re-arm some doors as part of a test. They noted to me:

NYPD is working to combat fare evasion and recently we complied with their request to re-activate alarms at several high traffic stations. This is a test for them to determine the alarms’ effectiveness in deterrence. At the same time, NYC Transit is working with NYPD to evaluate ways to reduce the inconvenience of the alarms for our paying customers and employees, looking into techniques such as enabling timed shutoffs. Nobody wants to hear an alarm going off, but revenue lost to fare evasion is revenue that can’t be used for running and maintaining the system, so we’re working with the NYPD to find the right balance.

Sarah Meyer, Transit’s Chief Customer Officer, also noted that the MTA should have an update on the effectiveness of the alarms “in a couple of weeks.”

The problems New Yorkers had with emergency exits haven’t gone away in the past decade, but the MTA’s priorities have shifted. Right now, the agency wants to fight fare evasion at certain key hot spots, and the gate sirens are one way to do so. The problem, of course, is one of action and reaction. As in the past, when the alarms go off, nothing happens other than lots and lots of noise. Cops or MTA employees (if any are even around) rarely, if ever, investigate, and the alarms serve as a clear signal to anyone nearby that a door that may be locked is now wide open. It’s almost an invite to potential fare evaders.

Outside of the noise pollution, the other problem with these alarms is how they stigmatize certain subway riders. Not everyone can get through NYC’s relatively narrow turnstiles (narrow to fight fare evasion in the first place, I should add). Parents or caretakers pushing strollers and people in wheelchairs who already confront a hostile system and those with large packages or suitcases simply can’t navigate the turnstiles. With stations including fewer and fewer employees, these folks are forced to enter through exits, and if the exits are now alarmed, the simple act of opening the day at the least inconveniences everyone and at the worst draws a crowd. I said this years ago, but the MTA could combat this problem by redesigning turnstiles to include wider, accessible entry gates that can fit wheelchairs and suitcases, as are standard in metro and subway systems throughout the world.

In fact, Meyer told me those gates are on the way as part of the MTA’s push toward more system accessibility, and I’m looking forward to them.

Ben, Alex Elegudin, Andy and I are indeed looking at wider, accessible fare gates. Hoping to bring them to the system soon.

— Sarah Meyer (@SarahMeyerNYC) January 15, 2019

For now, though, we left once again with subway alarms and a familiar debate. Can the NYPD respond to alarms in high-volume stations fast enough for them to serve as a fare evasion deterrent while the MTA responds to requests to open them fast enough to ensure people who need and have properly paid for access get it without causing an ear-splitting ruckus? That’s under review, and we’ll find out soon what end of the emergency exit alarm cycle we’re living through. Will it be the continuation of a quiet one or the dawn of a new, louder, siren-filled era?

February 6, 2019 42 comments
2 FacebookTwitterPinterestEmail
Fare HikesMTA Politics

The Delayed Fare Hike Edition of ‘That’s No Way To Run a Railroad’

by Benjamin Kabak January 29, 2019
written by Benjamin Kabak on January 29, 2019

A $3 base fare for subway and bus rides were among the fare hike options the MTA decided to push off until February.

When 2018 drew to a close, a level of certainty seemed to surround the MTA. The long-planned L train shutdown loomed four months out; a looming vote on fare hikes seemed to be a mere formality; and with momentum building for a congestion pricing plan, Andy Byford’s Fast Forward plan seemed well on the way to reality.

But then, thanks to Governor Andrew Cuomo, everything changed in the blink of an eye. Cuomo, circumventing the MTA Board, canceled the L train shutdown, sidelined Andy Byford from the project, and then capped off his month by pushing the MTA to delay the planned vote on the fare hikes. It was a flurry of activity orchestrated by the man in charge of the MTA who keeps insisting he isn’t pulling the strings, and it’s created uncertainty — and potentially budgetary pressures — at a time when the MTA can least afford to lose on the money.

The latest chapter in this saga began to unfold last week shortly before the MTA Board meeting that was planned to feature the fare hike vote. Now, as much as New Yorkers don’t want to pay more for what many perceive to be declining subway service, biennial fare hikes have been a feature of the MTA since the structure was approved as part of the 2010 bailout. Every two years, the fares increase by a modest amount, and these hikes, the best tool the MTA has for guaranteed revenue increases, have been met with relatively little resistance as the fare jumps are built into the budget.

But this time, after torpedoing the L train plans, Cuomo started speaking out against fare hikes, as Emma Fitzsimmons reported in The Times last week. Cuomo, expressing “no faith” in what his MTA says, urged the agency to avoid a fare hike. “Tighten your belt,” he said. “Make the place run better.”

In the same piece, former Cuomo aide and current MTA Board member Larry Schwartz said he was examining ways to tie fare hikes amorphously to, as he put it, “performance improvements” or would be otherwise “dead set” on voting for a hike. And then, during Thursday’s meeting, the MTA simply punted. Before any debate or alternative proposals could be presented publicly, the agency tabled all talks. “I’m concerned that we’re making a decision today when we need to be a little slower, a little more thoughtful, and need to consider a few more options,” Cuomo appointee Peter Ward said, moving to delay the discussion. The Board quickly decided to wait on debating fare hike proposals until the next meeting, currently scheduled for Wednesday, February 27.

What was so strange and abrupt about the move was how quickly it came about. The MTA Board had heard only some words from the governor and vague rumors of other proposals. After the vote, Schwartz said his efforts to develop a proposal tied to performance metrics was “in vain” despite internal conversations. To me, this is a good thing, as any attempt to tie guaranteed revenue to better service is one way to put the MTA on a path to a death spiral. If the agency can’t provide better service, the agency can’t raise fares or generate revenue for service at which point its only option is to cut service, thus leading to worse service, less revenue and that dreaded death spiral.

Much like with the L train shutdown shutdown, the “why” of the delayed fare hike vote remains an open-ended question. Dana Rubinstein tried to break it down. I’d urge you to read her entire piece, but I found this excerpt a succinct summary of this mess:

Gov. Andrew Cuomo controls the MTA’s L tunnel plans and the color of its tunnel tiles, but he claims he doesn’t control the MTA. The governor says he has “no faith” in the MTA’s leadership, which he helped appoint. He thinks the MTA doesn’t actually need more than $300 million a year in new fare revenue, because it can just “tighten” its belt and “make the place run better.” But he does think the MTA needs $1 billion a year in new revenue from congestion pricing, which he wants to see imposed on New York City. “It’s really hard to decipher,” said one board member, referring to the general state of MTA politics right now.

It’s well within Cuomo’s rights as the head of the state to attempt to reform the MTA, but running the agency as a fiefdom and operating behind closed doors at a time when the agency needs public support does little but undermine the MTA. With uncertainty clouding the fare hike discussion, it could now be a few months before the MTA can generate the revenue it claims it needs to avoid massive budget shortfalls. If new fare hike proposals are presented next month, the agency may need to hold additional public hearings, wait to vote on the new proposal and then wait to implement these proposals. Instead of a fare increase — and guaranteed revenue come April 1 — the MTA may have to wait to increase fares until July, losing out as much as $90 million it can’t afford to see wiped off the books. Ultimately, too, the public will pay for this politicking through increased hikes or service cuts.

To me, this is backsliding. After years of a commitment to transparency and a big show by Byford to produce a plan to do better, Cuomo has seemingly stepped in to blow everything up, and no one knows why. Did he do it because congestion pricing is now significantly closer to reality and he seems concerned about the political fallout from that move? Is he worried Corey Johnson and other city reps are making noises about re-asserting local control over subways and buses? Did someone actually shake him by his lapels to get him to focus on the L train and, by extension, the MTA?

No one yet knows why Cuomo is suddenly doing what he’s doing. But shortly after the fare hike vote was delayed, Cuomo had an about-face and acknowledged that the MTA would have to implement a rate hike sooner rather than later. It was an odd admission from the governor who had spent weeks slamming the agency for planning to raise fares and one that left observers scratching their heads even harder. Right now, Cuomo’s endgame is opaque and playing out on a day-to-day basis. Where this ends is up in the air, but riders, agency officials and MTA rank-and-file don’t know which way the wind will blow on any given day. And that’s no way to run a railroad.

January 29, 2019 35 comments
2 FacebookTwitterPinterestEmail
Penn Station Access

Penn Station Access to move forward as Cuomo announces Amtrak deal

by Benjamin Kabak January 22, 2019
written by Benjamin Kabak on January 22, 2019

After nearly a year of negotiations, the MTA and Amtrak reached an agreement so the Penn Station Access project can move forward.

It sure does take a while to turn transit dreams into reality in New York City. Take this website’s namesake subway line. What started as a line on paper in 1929 became reality in part only 87 years later. Penn Station Access — a plan to bring Metro-North trains to Penn Station via four new stops in the Bronx — won’t have such a tortuous long history, but this idea, born in 1973, will turn 50 before the trains finally run.

Yet the trains will run. Twenty years after planning began in earnest and scoping documents were released to the public, Amtrak and Metro-North reached an agreement on a long-simmering dispute so that Metro-North can build its four in-fill stations and operate along Amtrak right-of-way, delivering New Haven Line and Bronx commuter rail passengers to Manhattan’s West Side, Gov. Andrew Cuomo, again in charge of the MTA, announced yesterday.

“Too many residents of the Bronx have been without reliable transit, which is why I proposed these new stations,” Governor Cuomo said, of a project the MTA scoped in 2000 when Cuomo, then 43, was the HUD Secretary in the Clinton Administration. “With a reconstructed Moynihan Station currently underway, these four stations not only will connect the east Bronx to Manhattan’s West Side, but also build upon our ongoing efforts to fully transform our state’s transportation infrastructure.”

In addition to providing New Haven Line riders with direct access to the West Side, the plan includes four new Metro-North stations in the Bronx at Co-Op City, Morris Park, Parkchester/Van Nest and Hunts Point. The MTA has currently allocated around $700 million to the project though the total budget is estimated to exceed $1 billion, an astronomical price tag for four in-fill stations along a preexisting rail right-of-way. Cuomo’s Tuesday announcement included details of the first contract as HNTB New York Engineering and Architecture will get $35 million for engineering and design work.

While the Metro-North stations in the Bronx can help speed travel times to Manhattan for far-flung corners of that borough, I believe the reverse-commute patterns will be more important for Bronx residents who work in Westchester. Still, the MTA should use Penn Station Access as an opportunity to rationalize the fares for commuter rail trips within the five boroughs (a topic I last explored in 2015).

“Bringing Metro-North service to the east Bronx is a game changer for the borough, and we have all been eager to get started,” Interim MTA Chair Fernando Ferrer said in a statement. “This project will significantly reduce travel times for east Bronx residents and help area businesses and institutions attract employees.”

Metro-North and Amtrak had been at odds over the project, which involves MTA use of Amtrak’s Hell Gate Bridge, for some time, and it seemed as though the project’s future was in jeopardy. So what did Metro-North and New York State give Amtrak? Cuomo’s press release puts a New York-friendly spin on the deal, noting that Amtrak and the MTA will “jointly study the feasibility of Amtrak running several trains daily from Long Island to Penn Station and continuing either north to Boston or south to Washington.” The MTA will also foot the bill for signal, power, communications and track upgrades along the route.

Two articles provide more detail on the deal that our governor reportedly brokered. WNYC’s Stephen Nessen reports on a trade-off involving the Pelham Bay Bridge:

The stalemate hinged on two demands from Amtrak. One was that the MTA pay to replace the century-old Pelham Bay Bridge, which would get more traffic with the expansion. As far back as 2010 Amtrak had labeled the bridge “beyond a state-of-good-repair” and in need of more than $500 million to build a replacement. Under the agreement brokered by Cuomo, the Pelham Bay Bridge replacement would be postponed for 10-20 years. The other sticking point was that Amtrak wanted to charge the MTA access fees for using its tracks.

Amtrak gave up the demand for fees in exchange for the Long Island feasibility study I mentioned above, and Thomas Zambito had a bit more on the horse-trading in The Journal-News:

Under the agreement announced today, the MTA will pay for the cost of improvements along the Hell Gate as well as the design of the Bronx commuter stations, according to an outline of the agreement obtained by The Journal News/lohud.com.

The two railroads will share costs for use of the Hell Gate and the replacement of the Pelham Bay Bridge based on usage, the outline adds. And, Metro-North will coordinate the project around Amtrak’s plans to increase service levels on its Acela Express between New York and Boston in 2021.

So for Metro-North and Gov. Cuomo, all’s well that end’s well yet again. The MTA is shouldering a lot of costs for railroad updates, and the agency gets its rail link from Westchester to Penn Station. The service is expected to begin a year or two after East Side Access opens or right around the 50th anniversary of the first calls to bring trains through the Bronx to Penn Station. All it takes is far too much time.

January 22, 2019 77 comments
2 FacebookTwitterPinterestEmail
L Train Shutdown

Cuomo’s end run around MTA Board complete as L train shutdown is officially canceled

by Benjamin Kabak January 18, 2019
written by Benjamin Kabak on January 18, 2019

The MTA will move forward with the new plans for the L train tunnel without putting the matter to a Board vote. (Source: PDF).

The bizarre and tiresome saga of the L train shutdown shutdown seemingly came to a conclusion Thursday as the MTA officially called off the shutdown in one of the strangest press release I’ve seen the agency issue in nearly 13 years of running this site. The move, rumored to be on direct orders of Gov. Andrew Cuomo, completes an end-run around both the MTA Board and Andy Byford that had been strongly suggested during Tuesday’s meeting and effectively neuters the MTA Board. The new project is less safe and less comprehensive than a full shutdown but doesn’t carry the headaches that would have accompanied closing the L train for 15 months. It is now, for better or worse, firmly Andrew Cuomo’s move to own.

The press release is written as an “MTA update to L train riders” and isn’t available on the agency’s website. You can read it here on the state’s website in all of its informal glory. It starts out with a strangely familiar “as you know” and goes from there to stress that the shutdown “will not be necessary.” Here are the newsworthy bits:

This project is a major priority for the MTA and reconstruction will be supervised by MTA Capital Construction and overseen by MTA Managing Director Veronique Hakim. The MTA will also hire an independent consultant to oversee safety operations that will report directly to the Board.

The MTA is now working with the various contractors on a new final construction schedule and contracts which delete some elements of the initial construction plan and add the new design alternatives. We do not believe the cost of reconstruction will increase, and given the tremendous benefits to the riding public, reduction in the volume of traffic and savings from the traffic mitigation efforts, it is a clear positive alternative and in the public interest.

We expect the formulation of the final construction schedule and contract completions to take several weeks. The current construction estimate is 15 to 20 months. As soon as we have more definitive information we will provide it to our customers and the public.

A few days ago, Byford and the Board had requested the ability to hire an independent engineer to assess the new plan for its pluses and minuses before the MTA was to go forward. This press release clearly shifts the conversation as it is clear the agency is going forward, and the Board’s oversight role is diminished as the MTA — and not the Board — will hire “an independent consultant to oversee safety operations.” This isn’t an independent assessment of the plan but rather a safety oversight position. This move is not what Byford or the Board wanted, and it’s a clear sign that someone high up in Albany did not want this plan subject to the scrutiny it should receive.

Next, note that the MTA says “we” — whoever “we” is supposed to be here — “do not believe the cost of reconstruction will increase.” This is significant as it’s how the Board is removed from the equation. If the costs are to increase, the Board must approve a modification to the contract. If the costs are to remain the same (or decrease, as may be the case here), the MTA can execute a change order to its contract with WSP and avoid any Board oversight of the new plan. This is how Cuomo is apparently legally removing the Board from the equation.

I’ve reached out to some MTA Board members for comment and have not yet received a reply. The full Board is scheduled to meet for its regularly monthly sessions next week, and it will be interesting, to say the least, to see how they respond to this maneuver.

So we do not know the plan for mitigation; we do not know when the new work will start; we do not know how long it will; we do not know how the MTA and its contractors will manage silica dust or if the cable casings will be up to par for use in the L train’s tunnel. We do know that consultant on Tuesday said, “It certainly would have been advantageous for long-term service life to completely tear out the duct banks and completely replace them.”

The Post has a good rundown of some behind-the-scenes goings-on related to this L train move. One source they refer to as an “MTA insider” had harsh words: “Cuomo is saying he knows more about the technology stuff than the technology experts on the MTA board. “It’s just a demonstration of who runs the show. This is Cuomo being completely dominant over the MTA…We’re starting out marginally less safe. And that’s not a good place to start.”

Meanwhile, I’m still left wondering why Cuomo is doing this while also pushing for MTA reform. His call for reform involves more say and sway over the Board, but he’s demonstrated this week that he can simply dismiss the concerns of the Board if he wants something. Was this an intentional move to highlight how the Board is ultimately a figurehead? Or was this an example of Cuomo being Cuomo and one of those situations where he decided the way forward and heaven help anyone who tries to slow him down? We don’t yet know, but the L train shutdown is off, and the MTA Board isn’t getting a say in the matter after all.

January 18, 2019 32 comments
3 FacebookTwitterPinterestEmail
L Train Shutdown

Following contentious Board meeting, MTA officials strongly suggest L train plan a done deal

by Benjamin Kabak January 16, 2019
written by Benjamin Kabak on January 16, 2019

WSP presented its new plans for the L train work during a special session of the MTA Board on Tuesday. The MTA later said it planned to move ahead with this work despite no Board approval yet.

About mid-way through hour three of Tuesday’s interminable MTA Board venting session on the L Train Shutdown Shutdown, it started to dawn on a few astute members of the board that they were in essence being iced out of the decision-making process. They weren’t in the room to start an informed dialogue and evaluate different approaches to the necessary repair work on the L train tunnel; they were in the room to serve as foil as a bunch of MTA and contractor executives laid out the argument for a decision that had been made for them. No matter what the MTA Board said they wanted to do, the MTA was going to listen to orders from Gov. Andrew Cuomo and cancel the full shutdown in favor of the new plan.

The conversation began when Neal Zuckerman and later Polly Trottenberg started pulling on the threads of the MTA press release that trumpeted, in past tense, how the agency had “averted the shutdown” and the fact that signs touting the cancellation of the shutdown had appeared in L train stations. If the MTA Board still had to chime in, Zuckerman and Trottenberg wondered, why was MTA management treating this as a done deal? The exchange between Trottenberg and Interim MTA Chair Fernando Ferrer was a fascinating one, captured by Gothamist in its liveblog, and it’s well worth replicating here:

TROTTENBERG: As the MTA has gone off and put up signs that said L train shutdown averted, the board has had no vote on changing the contract or any of the terms here. Is the decision made? Do we have any actual role here? I’m not hearing that we do?

FERRER: I can address that commissioner. See there isn’t a change in a contract before us because there is no actual change to a contract at this point. Once there is, I am happy to have that brought before the board if I am still acting chairman. That’s my job, that’s my responsibility to consider it. If we have to consider an amendment to a contract or any other action, at the appropriate moment that will be brought before us and we’ll vote yes or no and abstain.

TROTTENBERG: So you’re saying we could vote no. What would that mean? The L train shutdown isn’t averted.

FERRER: You vote whichever way you like. I’ve never suggested how you should vote.

TROTTENBERG: You think in the end it will be the board’s decision?

FERRER: That’s what I’m saying.

TROTTENBERG: Maybe it’s premature to announce it before the board has made a decision, isn’t it?

FERRER: Decision on what? You’re asking about a contract. Stop, stop. Let’s not conflate these things. You’re asking about board action relating to a change in a contract. If there is any other service change than we will deal with that at the appropriate moment.

TROTTENBERG: But will those service changes be subject to the review of the board?

FERRER: [Frustrated sigh]

VERONIQUE HAKIM: Contracts come to the board based on our procurement guidelines. Change orders at certain levels come to the board. Service changes I think the term in the board approved service guidelines is “major service changes” also comes to the board.

TROTTENBERG: This seems like this is a major service changes. If we’re making major changes to the contact in terms of scope, in terms of price tag, in terms of liability, those are things that come to the board. I’m not saying we wouldn’t be in favor of all of this, I’m just confused: Does this plan need approval by the board or not? I am confused about it.

FERRER: The purpose for this meeting was to share information. Once there is a change, a plan, it becomes before the board again. We’re not going away.

TROTTEBERG: So if the signs says shutdown averted, it should have a footnote that says “subject to board approval”?

At this point, Ferrer answered but with his microphone off, and when asked about his unheard comments following the meeting, he grew testy and reiterated what he said to Trottenberg during the exchange. At no point did he address her concerns, or Zuckerman’s before her, about how the MTA was messaging a done deal before an independent engineering assessment or Board vote. On Tuesday night, the MTA all but confirmed this outcome in a statement emailed to reporters.

MTA going forward with the L slowdown after acting chair Freddy Ferrer told members they can vote if they need to change the contract pic.twitter.com/OpaQpaf8bp

— Dan Rivoli (@danrivoli) January 16, 2019

So is that it then for the L train shutdown? The statement from the MTA sure makes it sound like this was a decision made a few weeks ago when Gov. Cuomo held his press conference. MTA Board members haven’t yet voiced their views on tonight’s development, and the full Board is scheduled to meet next Tuesday in what is now a can’t-miss session for MTA watchers. To borrow a football image, though, the MTA is sprinting downfield at their opponent’s 15-yard line with no defenders in sight.

Concurrently, the other person who was about to throw up some roadblocks on the way to changing the L train plans has been sidelined too. As part of the meeting today, the MTA essentially moved this project out from Andy Byford’s purview. He will, as Ferrer said, be in charge of running the largest rail network in North America but will not have day-to-day oversight of the L train work as this project now belongs to MTA Capital Construction. Byford had spent last week trying to put the brakes on a headlong rush into something new by, among other things, calling for a truly independent assessment of the plan, a call echoed Tuesday by MTA Board Members before the MTA’s statement landed in inboxes a few hours later. (Dan Rivoli had much more on Byford’s role.)

If that’s it for the MTA Board’s role in this project, it’s an ignoble end and one that effectively neuters the Board. What’s the point of an oversight body that can be so thoroughly circumvented? Following the meeting, Nicole Gelinas wrote a column questioning Cuomo’s approach to the L train, and she hit upon this issue tangentially in concluding that the governor, via his meddling, “created a problem that did not exist.” Now, he or his MTA executives are pulling harder on that thread, trying to unravel the entire oversight structure. The MTA Board will be reduced to voting on contract changes and service patterns when and if those arrive, but as with the budget votes, they’ll have no real choice. It’s not yet clear why or what the ramifications are yet, but I’m sure we’ll find out in due time.

An Overview of the Meeting

With the behind-the-scenes machinations out of the way, let me do a quick run-down of today’s meetings. You can check out my Twitter threads that begin here and here for some running commentary. Unfortunately, the slides aren’t online, and they do add some context considering The Times report on Tuesday morning that the MTA had considered and rejected a similar plan in the past. WSP officials insisted the new plan was sufficiently different due to the cable racks and monitoring systems, and they spent the meeting claiming that they can mitigate the impact of silica dust in a way that won’t interfere with restoring rush hour service. I’ve highlighted two key points:

“It would have been advantageous to completely rip out the duct bank and replace it,” WSP engineer Michael Abraham admits.

— Danielle Furfaro (@DanielleFurfaro) January 15, 2019

The polymer coating on the crumbling bench wall will be a quarter to half-inch thick.

"That's not very much," MTA board member Norm Brown, a machinist, says.

WSP's Mike Abrahams says the polymer is flammable:

“It will melt and it will give off fumes.”

— Dan Rivoli (@danrivoli) January 15, 2019

We do not know when the work will begin, how long it will take, what mitigation plans will be in place or how much it will cost, but other than that, Mrs. Lincoln, how was the show? If you’ve walked away from this week believing the fix is in, you’d be right to think so. It’s still, as I keep saying, not clear why, but the fix is in.

January 16, 2019 18 comments
5 FacebookTwitterPinterestEmail
L Train Shutdown

Firmly in control of the MTA despite his own claims, Cuomo forces emergency L train board meeting

by Benjamin Kabak January 15, 2019
written by Benjamin Kabak on January 15, 2019

Andrew Cuomo, seen here in charge of the MTA, has required an emergency Board Meeting to review his L train plans.

Never one to accept not getting his way, Gov. Andrew Cuomo this weekend arm-twisted the MTA into holding an “emergency” Board meeting on his L train plan. Despite the fact that there is no real emergency and despite the fact that the MTA told its Board members of the meeting just 30 minutes before sending out a press release, Cuomo just had to exert the control he holds over the MTA to get what he wants. Now, in the face of a press growing more skeptical of his plan by the day and while trying once again to cast doubt on his firm control over the MTA, the transit agency’s governing body will meet on Tuesday to be briefed by the engineering firm WSP on the proposal. The MTA Board will not vote yet on the plan and may opt to hire an outside consultant to fully vet the plan, but Cuomo gets his way on the MTA yet again with an “emergency” meeting so Board members can sit there and listen.

When Gov. Andrew Cuomo forced the MTA to cancel the L train shutdown via a PowerPoint promising a better plan, he seemed to want to be seen as the savior of Brooklyn, the one to ride to the rescue of a beleaguered city facing a true transit crisis. At first, with the tabloids showering him with kudos, his team even took a victory lap before the good press evaporated.

It may still wind up that Cuomo’s plan carries the day, but over the past week, the narrative has shifted considerably. I wrote last week about the crisis of credibility engulfing everyone involved in the mess that has become the post-Sandy L train work, and since then, questions have been asked and doubts raised. Former MTA officials have been vocal in their critiques, and one-time NYC Transit head Carmen Bianco penned an Op-Ed for The Times urging Cuomo to slow down to ensure long-term safety isn’t sacrificed. “As the former president of New York City Transit,” he wrote, “and someone who witnessed firsthand the level of destruction and its impact on subway infrastructure as a result of Superstorm Sandy, I am concerned that the decision to change course on the Canarsie Tunnel project is premature and uninformed. This new plan has not been fully evaluated in terms of costs, available M.T.A. resources and, most important, safety.”

Bianco comes from the Transportation Industrial Complex Cuomo has railed on of late, but as Cuomo’s new L train proposal is being prepared by the same company that prepared the shutdown plans, I’m not sure how we can take seriously Cuomo’s attempts at defining and attacking this complex. But back to Bianco: He has no stake in the matter other than reputational. He retired from Transit three and a half years ago and currently works as a solo safety consultant. Does that leave him more credible or less? I’ll leave that up to you, but he’s not the only one urging careful consideration of the plan. NYC Transit President Andy Byford, toeing that line between heeding Cuomo, his boss, and advocating for the MTA, stated various to Community Boards and Brian Lehrer that he will not go forward with Cuomo’s plan until it has been vetted by an outside consultant. Questions remain regarding the impact of silica dust on the new plan and whether the feds will approve the new plan.

But the board meeting must go on, and Cuomo must show his actions carry the day by having the MTA Board, which has never yet turned down the governor who controls the MTA, meet, and so they shall meet. Not content with forcing a meeting Board members and MTA officials thought unnecessary and premature, Cuomo has reengaged on his years’-long disinformation campaign regarding MTA control. Simply put, he keeps lying about MTA control. As you, dear reader, know, the governor — in this case, Andrew M. Cuomo — is in charge of the MTA. He directly appoints six of 14 Board members but is also responsible for approving the recommendations of those county and city officials who name the other eight. In fact, he held up Ydanis Rodriguez’s attempted appointment a few years ago over concerns of conflicts of interest (prior, of course, to appointing Joe Lhota and his multiple jobs to the top spot at the agency). The governor also names every top official at the agency and often steps in on lower level hires. He is very much legally and apparently in control of the MTA.

Still, while pushing the L train issue, he’s also dug in again on the idea that he wants more control, and it is this type of reform that worried me last week. This started up against last week on the Brian Lehrer Show when Cuomo called in and said….this:

On the top of the list on the city agenda is going to be the MTA. This is madness. The MTA was created in the ’60s. It was designed to make sure no public official had control or accountability because it sets fares and no politician wanted to be near setting fares. So it was this convoluted – you have a board, I have six votes but it’s a 17 member board but the Speaker has a unilateral veto but the Senate leader has a unilateral veto but the Mayor has a unilateral veto. It is just a dysfunctional organization, and that has to change.

It took me a while to decipher this word salad, but Cuomo is effectively conflating two distinct bodies here. There is the 17-member MTA Board that oversees the agency and a separate four-member Capital Program Review Board that nominally signs off on the MTA’s multi-billion-dollar capital plan every five years and does little beyond that. The CPRB has no bearing on the day-to-day operations of the MTA which the governor controls, but he’s trying to confuse the issue.

Meanwhile, shortly after forcing the emergency MTA Board meeting this weekend, Cuomo, via his budget director, issued a lengthy press release presaging the MTA reform the governor is expected to push in Tuesday’s State of the State address. Much of Mujica’s statement falls back on the same obfuscation tactics Cuomo has been using, but it’s true intent is in a few paragraphs:

The Governor proposes congestion pricing and New York City and New York State split any funding shortfall 50/50. As the Daily News pointed out today, the City owns the transit assets and “is responsible for all capital spending.” An even split is more than generous. It is also what the State Legislature passed last year to fund the Subway Action Plan…

As the Governor has said, and repeats this legislative session, if the Legislature gives the Governor authority, he would accept the responsibility. But he would only take responsibility with authority. Basic executive authority would be a majority of the Board appointees, no independent unilateral vetoes of the budget by other elected officials, and hiring/firing and organizational authority. Nothing could be more reasonable, and no credible executive would require less.

No other Governor or Mayor has ever been willing to accept responsibility. History shows most work to deny connection with the MTA altogether. The Governor will step up, even if not politically in his own best interest…In short, the Legislature should pass congestion pricing and require the City and State to split any funding shortfall and also give the Governor operational responsibility.

It’s dangerous and foolhardy to tie congestion pricing in with MTA reform because if the latter fails and drags down the former, the entire region will be facing a crisis of mobility. It’s disingenuous to call for full control over every facet of the MTA when one already has that control while also claiming the city should pay for half of any funding shortfall. The governor wants even more power so he doesn’t have to face checks on his ability to set the agenda (which he barely does anyone) while twisting even more dollars out of the city which will have no say or ability in ensuring these dollars are spent on city, rather than suburban, projects. It’s a scam, not a reform effort.

I’ll come back to Mujica’s statement later and especially his claim that the MTA doesn’t pass its own budget. This is again an attempt to create confusion around the two MTA budgets — capital vs. operating — and how they work to complement each other. Until Andrew Cuomo attempted to shirk on his duties to the MTA, no credible executive of the state ever to argue his way out of MTA control and none have distorted history and legislative meaning as much as Cuomo as his team. He is in charge; the MTA is his; and everything about the L train shutdown just serves to underscore this reality. One person is in charge of this mess the MTA is in; one person has presided over the decline of the transit system. That person is Andrew Cuomo through and through.

January 15, 2019 13 comments
3 FacebookTwitterPinterestEmail
MTA Politics

Cuomo’s L train debacle creates opening for MTA reform

by Benjamin Kabak January 10, 2019
written by Benjamin Kabak on January 10, 2019

Gov. Andrew Cuomo assesses the L train tunnel during a December tour.

There are always unintended consequences to governing carelessly by unexpected press conference and off-the-cuff commentary, and as Gov. Andrew Cuomo and his team embarked on a tour to salvage whatever credibility they have left, it’s becoming clear that the crisis precipitated by Cuomo may open the door to MTA reform. Now, it’s a matter of who will take the reins and how.

Movement on MTA reform has been very slowly gaining speed over the past few months as more people have been paying attention to the way the MTA Board operations (or doesn’t) and the inherent contradictions in the current board structure. I’d urge to read Aaron Gordon’s November Signal Problems dispatch for more on that topic.

As Cuomo engaged in his offensive this week, when he gets going, the words just start to flow from his mouth, and he hit upon some nuggets that hit upon reform in a conversation with The Daily News. Kenneth Lovett and Dan Rivoli had more:

Frustrated by what he sees as an entrenched bureaucracy that lacks imagination to find new ways to do things, Gov. Cuomo said Monday it’s time to rebuild the MTA from ground up. “Blow up the MTA. Blow it up,” Cuomo said during a meeting with the Daily News Editorial Board…

“The L train is a window into a much bigger problem,” Cuomo told The News. He referred to a “passive conspiracy of the transportation industrial complex” where major capital projects are undertaken with the same contractors and vendors, and no competition for designs. Construction contractors typically pad their bills to the MTA by 25% — an “MTA premium” — because of the difficulty they have dealing with agency bureaucrats. MTA board members are trying to figure out how to lower their construction costs. “The MTA is so tedious to deal with that it developed a boutique industry of people who just are willing to deal with this thing called the MTA,” Cuomo said. “And the people who know how to do it normally came from the MTA and then go to the contractor and that’s why they know how to make the connection.”

…He plans to continue his effort to reform the agency — Cuomo in a recent speech said one of his priorities in the first 100 days of 2019 is to restructure the MTA and find it more funding. He said he is not afraid to take responsibility for what happens at the MTA, as long as he’s not “handcuffed.” “I am unique in governors who are willing to step up and sign on the bottom line,” he said of such projects as the building of a new Tappan Zee Bridge and installation of cashless tolling. “My people think it’s an act of madness,” Cuomo said of his quest for more power over the agency. “I don’t care. I have no problem stepping up and saying it’s me. More than any other governor. But I’m not going to say ‘it’s me’ handcuffed.”

Cuomo starts out strong, but his comments fizzle toward the end. He engaged in another diatribe on whether or not he controls the MTA (he does), and The News gave him more cover for this argument than I would have, allowing Cuomo to compare the MTA (which he controls) to the Port Authority (which no one controls). It’s not an apt comparison, and it reminds me of the problems with trusting Cuomo with MTA reform. Cuomo doesn’t listen to experts; rather, he thinks he is the expert. So if he has a vision for MTA reform (just like he has a vision for the L train work and a vision a backwards AirTrain), his vision will become reality whether it’s an improvement or not.

But in his opening remarks at least, he hit upon a key problem with the New York City transportation ecosystem: It is very much a transportation industrial complex with a very active revolving door shuttling the same people between the public and private sectors. This essentially eliminates any incentives for internal-driven MTA reform as the same people who sign off on contracts end up being the same people who benefit from runaway costs and project timelines in years rather than months and decades rather than years. The “difficulty” in dealing with agency bureaucrats is a feature, not a bug.

Cuomo, who spoke about MTA reform in the lead-up to his reelection last year, hasn’t given any indication that he has a vision beyond adding more seats under his control to the Board. I’m not quite sure where that gets him considering the MTA Board has never rejected a Cuomo initiative and he already has legal control over the agency. The reform must be structural and not cosmetic, and the L train mess, which has led everyone to rightly question the competency of the MTA, is an opportunity to push for major reforms. The problem, of course, is that the L train mess has also led everyone to question Cuomo’s competency here, and as I keep saying, no one currently involved has any credibility on the topic. Thus, the person spearheading reform shouldn’t be the person few trust.

Enter New York City. At an event at a subway stop in Bay Ridge promoting his effort to assess subway rider complaints, City Council Speaker (and current acting Public Advocate) Corey Johnson let slip that he is working on a proposal for city control of its subways and buses. Johnson didn’t offer details other than a promise to release a report within 60 days, but he had some intriguing things to say. “The detailed plan I will unveil in the next 60 days,” he said, “talks about debt obligation, bonding authority, the tunnels and the bridges, and it does not just talk about the subways and buses, but talks about breaking the car culture by investing in mass transit, prioritizing pedestrians and cyclists and making New York City a livable safe city.”

Analyzing the ins and outs of city control is both well outside the purview of this post and premature without a proposal in hand, but it’s clear that something’s a-brewin’ in New York over MTA governance and MTA control. If anything comes out of this crisis of confidence Andrew Cuomo created last week, a true push for MTA reform would be a welcome one, and the shape and a full public debate on structure of transit governance in New York City is one that is long overdue.

January 10, 2019 17 comments
2 FacebookTwitterPinterestEmail
Load More Posts

About The Author

Name: Benjamin Kabak
E-mail: Contact Me

Become a Patron!
Follow @2AvSagas

Upcoming Events
TBD

RSS? Yes, Please: SAS' RSS Feed
SAS In Your Inbox: Subscribe to SAS by E-mail

Instagram



Disclaimer: Subway Map © Metropolitan Transportation Authority. Used with permission. MTA is not associated with nor does it endorse this website or its content.

Categories

  • 14th Street Busway (1)
  • 7 Line Extension (118)
  • Abandoned Stations (31)
  • ARC Tunnel (52)
  • Arts for Transit (19)
  • Asides (1,244)
  • Bronx (13)
  • Brooklyn (126)
  • Brooklyn-Queens Connector (13)
  • Buses (291)
  • Capital Program 2010-2014 (27)
  • Capital Program 2015-2019 (56)
  • Capital Program 2020-2024 (3)
  • Congestion Fee (71)
  • East Side Access Project (37)
  • F Express Plan (22)
  • Fare Hikes (173)
  • Fulton Street (57)
  • Gateway Tunnel (29)
  • High-Speed Rail (9)
  • Hudson Yards (18)
  • Interborough Express (1)
  • International Subways (26)
  • L Train Shutdown (20)
  • LIRR (65)
  • Manhattan (73)
  • Metro-North (99)
  • MetroCard (124)
  • Moynihan Station (16)
  • MTA (98)
  • MTA Absurdity (233)
  • MTA Bridges and Tunnels (27)
  • MTA Construction (128)
  • MTA Economics (522)
    • Doomsday Budget (74)
    • Ravitch Commission (23)
  • MTA Politics (330)
  • MTA Technology (195)
  • New Jersey Transit (53)
  • New York City Transit (220)
  • OMNY (3)
  • PANYNJ (113)
  • Paratransit (10)
  • Penn Station (18)
  • Penn Station Access (10)
  • Podcast (30)
  • Public Transit Policy (164)
  • Queens (129)
  • Rider Report Cards (31)
  • Rolling Stock (40)
  • Second Avenue Subway (262)
  • Self Promotion (77)
  • Service Advisories (612)
  • Service Cuts (118)
  • Sponsored Post (1)
  • Staten Island (52)
  • Straphangers Campaign (40)
  • Subway Advertising (45)
  • Subway Cell Service (34)
  • Subway History (81)
  • Subway Maps (83)
  • Subway Movies (14)
  • Subway Romance (13)
  • Subway Security (104)
  • Superstorm Sandy (35)
  • Taxis (43)
  • Transit Labor (151)
    • ATU (4)
    • TWU (100)
    • UTU (8)
  • Triboro RX (4)
  • U.S. Transit Systems (53)
    • BART (1)
    • Capital Metro (1)
    • CTA (7)
    • MBTA (11)
    • SEPTA (5)
    • WMATA (28)
  • View from Underground (447)

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Facebook
  • Twitter
  • Instagram

@2019 - All Right Reserved.


Back To Top