While browsing LTV Squad’s latest offering on a former subway station entrance, I came across another piece from the mysterious author known as Control. It is, at once, both the most obnoxious and the most compelling takedown of the Triboro RX line I’ve seen so far. While many transit advocates — myself included — are salivating over the idea of such a circumferential routing, Control throws a bunch of hot water over it.
So what are the challenges? The main issue surrounds the way some of the right of way is currently used. A considerable amount of products bound for New York rely on the heavy rail lines used for freight that the Triboro RX would commandeer for passenger rail. Control believes the prices of food and goods would skyrocket, and trash collection could become problematic as well. These are arguments that have been put forward by supporters of a trans-harbor freight rail tunnel who also wish to keep the ROW for freight rail.
The physical challenges too are tremendous. If the MTA can’t get an FRA waiver, the ROW isn’t wide enough to accommodate separate tracks for passenger rail and freight. I’m far less sympathetic to the fact that there has been some encroachment onto the right of way or that eminent domain would be necessary to complete the route, but we can’t ignore those challenges.
Ultimately, I think Control’s take is worth a read. His conclusion — “MOVE CLOSER TO WHERE YOU WORK” — is myopic and undermines his point, but ultimately, Triboro RX isn’t as easy as drawing some lines on a map and calling it a done deal. He writes that “the Triboro RX subway will never, ever happen,” and it’s probably better to pick easier battles.