Home Service Advisories G train shutdown beings as weekend work affects 12 subway lines

G train shutdown beings as weekend work affects 12 subway lines

by Benjamin Kabak

Temporary signage at Nassau Ave. spells out the summer reality for G train riders. (Via @CarynRose)

As I write this at 10:10 p.m. on Friday evening, we’re approximately 45 minutes away from the last Church Ave.-bound G train’s departure from Court Sq. That train is set to leave at around 10:52, and then the Greenpoint Tubes will be shut down until Sept. 2. The MTA has to shutter these tunnels to make repairs from Sandy, and in the coming months, we’ll hear about more Sandy-related work that must be repair and fortify the system.

Meanwhile, there’s now a free out-of-system transfer between the G at Broadway and J/M trains at Lorimer in South Williamsburg, and if you’re a G train rider, Uber has a deal for you. They’re offering a free transfer deal for Greenpoint and Long Island City riders. Essentially it’s one free ride anywhere between Nassau Ave. and Court Sq. for the next few weeks. Check out their blog for more information.

Meanwhile, here’s the rest of your weekend work.


From 3:45 a.m. Saturday, July 26 to 10:00 p.m. Sunday, July 27, due to track panel installation south of Prospect Av, and overcoat painting south of Jackson Av, 2 trains will run in two sections:

  • Between 241 St and 149 St-Grand Concourse with Manhattan-bound 2 trains running express from E 180 St to 3 Av-149 St.
  • Between 149 St-Grand Concourse and Flatbush Av.


From 11:00 p.m. Saturday, July 26 to 6:00 a.m. Sunday, July 27, and from 11:00 p.m. Sunday, July 27 to 5:00 a.m. Monday, July 28, Crown Hts-Utica Av-bound 4 trains run local from 125 St to Grand Cantral-42 St due to CPM cable work south of 125 St.


From 6:00 a.m. to 11:00 p.m. Saturday, July 26, and from 8:00 a.m. to 11:00 p.m. Sunday, July 27, 5 trains are suspended between E 180 St and Bowling Green due to track panel installation south of Prospect Av, and overcoat painting south of Jackson Av. 4 trains make all 5 station stops between 149 St-Grand Concourse and Bowling Green. 5 shuttle service operates all weekend between Dyre Av and E 180 St.


From 11:45 p.m. Friday, July 25 to 4:00 a.m. Monday, July 28, Brooklyn Bridge-bound 6 trains run express from Pelham Bay Park to Parkchester due to station rehabilitation work at Buhre Av and Zerega Av, and platform edge and canopy work at Pelham Bay Park.


From 7:30 a.m. to 11:00 p.m. Saturday, July 26, and from 11:00 a.m. to 9:00 p.m. Sunday, July 27, 6 trains run every 14 minutes between Pelham Bay Park and Parkchester. The last stop for some trains headed toward Pelham Bay Park is Parkchester, due to station rehabilitation work at Buhre Av and Zerega Av, and platform edge and canopy work at Pelham Bay Park.


From 11:45 p.m. Friday, July 25 to 5:00 a.m. Monday, July 28, Times Sq-42 St-bound 7 trains run express from Mets-Willets Point to 74 St-Broadway due to CBTC related work on the Flushing line.


From 11:45 p.m. Friday, July 25 to 5:00 a.m. Monday, July 28, A trains are suspended in both directions between Ozone Park-Lefferts Blvd and Rockaway Blvd due to CPM station rehabilitation work at 88 St and 104 St stations. Howard Beach/Far Rockaway-bound A trains skip 88 St. Free shuttle buses provide alternate service via 80 St.


From 12:01 a.m. Saturday, July 26 to 5:00 a.m. Monday, July 28, E trains will run local in Queens due to CPM signal modernization at Forest Hills-71 Av and Kew Gardens-Union Tpke, and CPM track tie renewal at 65 St.


From 12:01 a.m. Saturday, July 26 to 5:00 a.m. Monday, July 28, F trains will run local in Queens due to CPM signal modernization at Forest Hills-71 Av and Kew Gardens-Union Tpke, and CPM track tie renewal at 65 St


Beginning 10:30 p.m. Friday, July 25, until 5:00 a.m. Tuesday, September 2, G trains are suspended between Long Island City-Court Sq and Nassau Av due to MOW Fix & Fortify Sandy Recovery Work in the Greenpoint Tube. Transfer out-of-system (with MetroCard) between the Broadway G station and Lorimer St JM stations. Free shuttle buses provide alternate service along two routes:

  • Via Manhattan Av between Nassau Av and Court Sq, stopping at Greenpoint Av and 21 St.
  • Via McGuinness Blvd between Lorimer St L and Court Sq, stopping near G stations at Nassau Av, Greenpoint Av, and 21 St.


From 11:30 p.m. Friday, July 25 to 5:00 a.m. Monday, July 28, N trains are suspended between Times Sq-42 St and Queensboro Plaza due to MOW Track and plated work in the 60 St Tube, chip and pour south of 5 Av, and switch work south of Queensboro Plaza. Take the 7 or Q instead.


From 12:01 a.m. Saturday, July 26 to 5:00 a.m. Monday, July 28, Q trains will run local in Queens due to MOW Track and plated work in the 60 St Tube, chip and pour south of 5 Av, and switch work south of Queensboro Plaza.


From 5:30 a.m. to 12 midnight, Saturday, July 26 and Sunday, July 27, due to MOW Track and plated work in the 60 St Tube, chip and pour south of 5 Av, and switch work south of Queensboro Plaza, R trains are rerouted on the D and M lines in both directions as follows:

  • Via the D line between DeKalb Av and B’way-Lafayette St.
  • Via the M line between B’way-Lafayette St and Queens Plaza.

You may also like

4 comments

Abba July 26, 2014 - 10:24 pm

First of all the Q is running local in Manhattan not Queens.Second it’s unclear if the R is stopping at 14 and 23 st but I assume it is.

Reply
Simon July 29, 2014 - 10:28 am

Yes because it’s running via the M and the M stops there.

Reply
Smith July 28, 2014 - 1:08 pm

On my L train commute this morning multiple recorded announcements were played about the G train shutdown, but the audio and digital text referred to *weekend* suspensions of service until for five weeks. Confusing, as I’d heard it was 24×7 until September.

Reply
Benjamin Kabak July 28, 2014 - 1:09 pm

It is 24/7. Those audio announcements are wrong.

Reply

Leave a Comment